| This one is from 8/24 and shows them starting the light steel framing on the
2nd floor.
| This is from 9/1 and shows the clinic from the back, with about 1/2 of the
roof trusses in place.
|
| This one is also from 9/1 and shows a front view, with 1/2 of the roof
trusses in place.
|
| This is from 9/4 and is taken standing on top of the
container which is being
used to store equipment. It is the back view, again, of the clinic. |
| This was taken today, 9/7, and shows the crane supporting the metal stairs
while the men are trying to put them in place. It was a full day job,
because the supports for the stairs were not made right, and so had to be cut
down and rewelded, etc., etc.
|
| This one, also taken today, 9/7, shows us with John Morton, the man from
Arkansas who came to help the Romanian construction team do the work, and to
teach them what they didn't already know about light steel construction. He
was absolutely great to work with!
|
| This was taken today, 9/7, and shows the view of and from the upstairs.
|
|