Building Progress - September 2000

see May's Progress Pictures see July's Progress Pictures

This first one is from 8/8/00. This shows the men working on the light steel framing for the main floor.
This picture is from 8/16 and shows them putting down the plywood flooring for the 2nd floor.
This one is from 8/24 and shows them starting the light steel framing on the 2nd floor.
This is from 9/1 and shows the clinic from the back, with about 1/2 of the roof trusses in place.
This one is also from 9/1 and shows a front view, with 1/2 of the roof trusses in place.
This is from 9/4 and is taken standing on top of the container which is being used to store equipment. It is the back view, again, of the clinic.
This was taken today, 9/7, and shows the crane supporting the metal stairs while the men are trying to put them in place. It was a full day job, because the supports for the stairs were not made right, and so had to be cut down and rewelded, etc., etc.
This one, also taken today, 9/7, shows us with John Morton, the man from Arkansas who came to help the Romanian construction team do the work, and to teach them what they didn't already know about light steel construction. He was absolutely great to work with!
This was taken today, 9/7, and shows the view of and from the upstairs.